Choosing a PCB assembly supplier on price alone is how programmes end up late, over budget, or both. A cheap quote that omits test time, sources grey-market parts, or inspects by sampling only looks cheaper. It is a different product at a different risk. This checklist covers what to verify, in the order that eliminates the wrong suppliers fastest.

1. Capability match

Start with fit, not price. Confirm the supplier builds what you are buying: your board sizes and layer counts, your smallest packages (0402, QFP, BGA), your mix of SMT and through-hole, and whether box build, firmware loading and packing are in-house if your programme needs them. A supplier that outsources half your scope is a broker with a factory tour. Ask which processes stay in-house and which are subcontracted, and to whom.

2. Inspection and test coverage

This eliminates more suppliers than any other question. Require specifics: SPI after paste printing, 100% AOI after placement (not sampling), X-ray for BGA and QFN packages, and in-circuit plus functional test with per-unit records retained. Then ask for the end-of-line defect rate over the last 12 months. Below 0.5% is competent and below 0.2% is excellent. A supplier that cannot quote the number does not track it.

3. Component sourcing discipline

Ask where parts come from and what happens when the BOM has a problem. Authorised distributors or qualified partners, every incoming lot verified against the part number, no relabelling, no undocumented substitutions. And critically: how are obsolete, single-source and long-lead parts handled? Flagged to you before ordering, or discovered when the line stops? Our BOM review reports these risks before you commit.

4. Lead time honesty

Prototype builds in 15 days from build-ready files are achievable on production lines. Verify that is what the supplier means: production lines with production inspection, not a bench shortcut whose quality data says nothing about volume. For production, ask what drives the schedule: it is almost always component availability. A supplier that quotes a date without checking lead times on your BOM is quoting a wish.

5. Communication and engineering depth

Your first RFQ exchange predicts the whole relationship. Does the supplier review your files for manufacturability and report problems, or just quote? Are engineering questions answered by engineers? Is there a single point of contact who owns your programme? Time-zone coverage and English-language engineering support matter more than a multichannel support page.

6. Certifications as framework, not proof

ISO 9001:2015 covers the quality system, BSCI and SEDEX/SMETA cover the operating environment. Ask to see the certificates, then ask for the defect rate anyway. The number proves the system works.

Red flags that disqualify a quote

  • No stated defect rate, or “zero defects” claimed without data
  • AOI by sampling, no X-ray offered for BGA assemblies
  • Substitutions allowed without your written approval
  • Quote with no stated assumptions on test time, alternates or handling margin
  • No manufacturability review of your files before quoting
  • Consignment stock without a tracking and reporting method

The short version

Capability match, full inspection with a quoted defect rate, disciplined sourcing with pre-order risk reports, honest lead times on production lines, engineering-depth communication, certificates plus numbers. Run every candidate through these six, and the cheapest remaining quote is usually also the safest.