Search “PCB assembly cost China” and you will find pages quoting a per-board price as if assembly were a commodity with a menu. Two boards with the same dimensions can differ in cost by a factor of ten depending on what sits on them. Any supplier that gives you a firm number without seeing your BOM is guessing. The correction arrives later, as a revised quote or a quiet substitution.
We quote every programme against the BOM. This guide explains why that is the only honest method, which factors move the number, and how to get a quote you can plan against.
Why there is no price list
A PCB assembly quote has three independent parts, and only one of them is factory labour:
- Bare boards, driven by size, layer count, material, surface finish and panelisation. Stable and quotable from Gerbers alone.
- Components at sourced cost, typically 70—0% of the total on most programmes. Set by the market, your part choices and availability, not by the factory.
- Assembly, test and handling: placement time, test time, programming, packing. The smallest and most predictable of the three.
Because components dominate, the same factory running the same line quotes wildly different totals for different BOMs. A board with forty commodity passives costs little to populate; a board with one allocated microcontroller costs whatever that part costs this month. Fixed price lists hide this by assuming the cheapest case, then revising upward once your real BOM arrives.
What moves your quote
- Component selection. Brand-name versus alternate parts, package sizes, single-source and obsolete lines. The single biggest lever, and the one you control most at design time.
- Board complexity. Layer count, fine-pitch and BGA packages, mixed SMT and through-hole, impedance control. These set fabrication cost and inspection requirements (BGA means X-ray).
- Volume and panelisation. Setup, programming and test development amortise across units. Prototypes carry the full setup cost on a handful of boards; volume spreads it thin.
- Test scope. A visual-only check versus in-circuit plus functional test with per-unit records. Test time is real engineering time. Quotes that leave it out look cheaper on paper and arrive incomplete.
- Lead time. Standard sourcing versus expedited parts, air freight versus sea. Urgency has a price, and it should be stated, not absorbed into a vague total.
- Consignment versus turnkey. Consigning parts you already hold at franchised pricing can lower the total; turnkey shifts sourcing work and availability risk to the supplier for a stated handling margin.
How BOM-based quoting works
Send the Gerbers or ODB++, the complete BOM with manufacturer part numbers, assembly drawings and test or programming requirements. Our process:
- Engineering review first. Footprints against actual parts, polarity, test-point access, manufacturability, with problems reported before pricing, never after ordering.
- Every BOM line costed and availability-checked. Standard parts from authorised distributors, risky lines flagged with alternates proposed for your approval.
- Risk report before commitment. Obsolete, single-source and long-lead parts surfaced with options, while the schedule can still absorb them.
- Three-part quote. Bare boards, components at sourced cost plus a stated handling margin, and labour plus test time, each of them visible and challengeable.
Substitutions are never made without your written approval. If a part goes end-of-life mid-programme, you hear about it with an approved alternate and a revised line item, not as a silent swap discovered in the field.
How to compare quotes fairly
Two quotes are only comparable when they assume the same thing. Check each candidate on: whether test time and fixtures are included, whether alternate parts are priced or assumed, whether the handling margin is stated, what happens on obsolescence, and whether inspection is 100% AOI with X-ray or sampling. A quote comes in lower by omitting test, assuming grey-market parts and inspecting by sampling. That is not a better price. It is a different product with your risk priced at zero.
Lowering cost without lowering quality
The honest levers: consolidate to standard packages and values where the design allows, approve alternates for single-source lines during calm periods rather than shortages, panelise efficiently, reuse proven test fixtures from a prototype programme, and give the supplier lead time instead of paying for urgency. What not to do: chase the lowest headline number from a supplier that cannot quote a defect rate. The rework, delays and field failures cost multiples of whatever the quote saved.
Send your BOM and Gerbers for a line-by-line quote with the sourcing assumptions stated. If the design has a cost problem (an obsolete part, a needlessly exotic package, a test gap), you will hear about it before ordering, which is exactly when it is cheapest to fix.