Services
Services
Beyond assembly, we fabricate bare boards and take on component procurement. Two services that either sit outside a normal assembly scope or decide whether the build can start at all.
Material Procurement
Component sourcing, consignment handling and incoming inspection, so the build does not wait on the supply chain.
- A build schedule you can plan against
- Obsolescence and single-source risk surfaced before you commit
- Components verified before they reach the line
PCB Fabrication
Bare board fabrication from simple single-layer designs through to complex multi-layer builds.
- Bare boards that arrive testable and dimensionally correct
- Design problems caught at the data stage
- Inspection reports attached to every shipment
Looking for assembly instead? See PCB assembly, box build and prototyping.
Get Started
Tell Us What You Need Manufactured
Send your drawings, Gerbers or BOM. Our engineers review what you have and reply with what we can build, what we would change, and how long it takes. Guaranteed response within 24 hours.
Design Feedback Before You Commit
We review your design for manufacturability and tell you what we would change, before it becomes a production problem.
Certified and Audited
ISO 9001:2015 quality management, amfori BSCI and SEDEX/SMETA audited, with inspection records retained per production run.
Prototype in 15 Days
A working physical sample built on the production line, not a separate prototype process — so what you validate is what you receive.