If you have sent out a PCB assembly RFQ, you have seen the word “turnkey” on nearly every supplier reply. It is worth pinning down what it actually commits each side to. A turnkey quote and a labour-only quote can differ by an order of magnitude, and comparing them as if they were the same thing is how programmes go over budget.
What turnkey PCB assembly means
Turnkey PCB assembly means the supplier takes responsibility for everything between your design files and tested boards. That covers fabricating or procuring the bare board, sourcing every component on the BOM, placing and soldering, inspection and test, and packing for shipment. You supply the design data: Gerbers or ODB++, the BOM with manufacturer part numbers, assembly drawings and test requirements —and receive finished assemblies back.
The name comes from the idea that the job is handed over complete, “turn the key and it runs”. The opposite arrangements are consignment, where you supply some or all of the parts and the factory supplies only labour and equipment time, and partial turnkey, where the factory sources the common parts and you consign the critical or long-lead ones.
What the supplier handles, step by step
A turnkey programme at Sanmitron runs in this order:
- Engineering review. Your Gerbers, BOM and assembly drawings are checked for manufacturability: footprints against actual parts, polarity, test-point access, single-source and obsolete parts flagged before anything is ordered.
- Bare board procurement. Boards are fabricated to your stack-up and material specification, then electrically and dimensionally inspected on arrival.
- Component sourcing. Every line of the BOM is sourced from authorised distributors or qualified partners, with cost and availability confirmed in writing. Substitutions are never made without your approval.
- SMT and through-hole placement. Four Panasonic CM602 lines place from 0402 passives through QFP and BGA packages at 130,000 placements per hour per line.
- Inspection and test. 100% automated optical inspection after placement, X-ray for hidden joints such as BGAs, then in-circuit and functional test recorded per unit. Our end-of-line defect rate runs below 0.2%.
- Packing and dispatch. Boards packed to your specification (trays, reels, cartons), with test records attached and shipping to more than 30 countries.
Turnkey vs consignment vs partial: which fits your programme?
| Turnkey | Partial turnkey | Consignment | |
|---|---|---|---|
| Who sources parts | Supplier | Split | You |
| Your purchasing workload | Minimal | Moderate | Full |
| Best when | You want one accountable supplier | You hold stock of key parts | You have franchised pricing or allocated stock |
| Risk | Supplier manages availability and obsolescence | Shared | You carry shortage and obsolescence risk |
For prototypes and first production runs, turnkey is usually the right call: the quantities are too small for your own purchasing to be efficient, and the factory’s sourcing desk sees shortages and alternates across dozens of programmes. For stable high-volume runs where you hold franchised distributor agreements, consignment can be cheaper. We support both, and consigned stock is tracked against your build with a running balance.
How turnkey pricing works
A turnkey quote has three visible parts: the bare boards, the components at sourced cost plus a procurement handling margin, and the assembly labour and test time. What to watch for in a quote is not the headline number but the assumptions behind it: whether alternate parts are priced or assumed, whether test time is included, whether the handling margin is stated, and what happens when a part goes end-of-life mid-programme. Our quotes state each of these explicitly, and our BOM review reports obsolescence and single-source risk before you commit rather than after the schedule slips.
When turnkey is the wrong choice
Turnkey is not always optimal. If your volumes are large and stable, your own distributor pricing may beat anything a factory can offer. If your product depends on a single allocated component you already hold, consigning it removes a risk the factory cannot control. And if your design is still changing weekly, freezing a BOM for a turnkey order will cause more revision churn than building on a labour-only basis while you source flexibly. A good supplier will tell you which of these applies. It belongs on your shortlist of questions before you commit, alongside inspection coverage, traceability and test records.
Starting a turnkey programme
Send the Gerbers or ODB++, the BOM with manufacturer part numbers, assembly drawings and any test or programming requirements. We review the package for manufacturability and return a quote with the sourcing assumptions stated. If the design has a problem that would fail on the line, you hear about it before ordering, not after. Prototype builds run 15 days from receipt of build-ready files, on the same lines and with the same inspection as production.